This is the Long Bridge Aquatic Center located in Arlington, VA
Project Details:
LEED GOLD
110,000 square foot Aquatic Center
DET – 42% More efficient than ASHRAE 90.1 – 2007
1. Improved Lighting and Controls Design |
2. Daylight Harvesting |
3. 2-Step Lighting Dimming Controls |
4. Ground-Loop Heat Exchanger (GLHX) Thermal Storage |
5. Central Plant Heat Pump/Chiller with GLHX |
6. Energy Recovery Ventilation |
7. Energy Efficient Variable Flow Fans |
8. Energy Efficient Variable Flow Pumps |
9. Solar HW Array to Heat DHW and Swimming Pools (600 MBH) |
10. DHW Thermal Storage |
11. LED Interior Lighting |
12. LED Exterior Lighting |
13. DHW Buffer Preheat |
14. 130 kW Microturbine (CHP) |
15. EMS Control Strategies (for energy savings) |